Solutions Hub
Lyophilization Cycle Development
Demo
Design and optimize freeze-drying cycles with heat-transfer modeling, sublimation rate estimation, and interactive cycle visualization. Adjust parameters and see real-time impact on cycle time and collapse risk.
Product & Vial
Freezing
Primary Drying
Secondary Drying
Total Cycle
64.8 hr
Sublimation Rate
53.8 mg/hr
Kv
9 W/(m²·K)
Collapse Margin
15 °C
Lyophilization Cycle Profile
Shelf temperature and chamber pressure over time
Phase Breakdown
Freezing Ramp1.1 hr
1.7%
Freezing Hold2.0 hr
3.1%
Primary Ramp25 min
0.6%
Primary Drying51.2 hr
78.9%
Secondary Ramp4.2 hr
6.4%
Secondary Hold6.0 hr
9.3%
Total64.8 hr (3,890 min)